Excellent attention has been compensated on environmental safety and vitality conserving. Our goods are made by modern day computerized equipment and gear. Our organization pays specific attention to customers’ wants, listening to the certain needs of every client and guaranteeing complete satisfaction.
EPTT 50 Ton Cell Crane EPTT Qy50ka EPTT EPTT Crane Cost Listing
EPTT QY50KA EPTT crane’s framework is compact, the business functioning efficiency is the maximum. EPTT performance and driving performance of a complete up grade, major rivals. Dual-pump confluence EPTT, working efficiency of a thorough lead.
one. EPTTing lifting and driving performances
5 EPTT U-sort booms. The boom size is 11.4m-forty three.5m with strong lifting efficiency, leading 5%-ten% in advance of goods with the identical tonnages in the very same industry.
Large-EPTT motor with very good dynamic overall performance, powerful gradeability and excellent trafficability. The maXiHu (West Lake) Dis.mum gradeability and maXiHu (West Lake) Dis.mum travel speed respectively are 42% and 85km/h.
2. Dependability of warmth dissipation, EPTT technique etc. has been improved with safer procedure and driving
Watertight connector clip is outfitted with rubber sheath inside of with exceptional drinking water impervious and level of protection reaches to IP65.
The air-conditioning condenser is independently installed, the heat-sinking ability is sharply improved and the atmosphere temperature achieved to a lot more than forty five ordmC.
three. Mature and reputable double-pump confluence approach, mainXiHu (West Lake) Dis.Hu (West Lake) Dis. the positive aspects of productive operation
The double-pump confluence strategy is adopted in increasing and falling of winch, extending and retracting of lazy boom and luffing, leading in advance of luffing and extending and retracting functions.
4. Air-assist shift EPTTs and 45% of shifting drive is diminished
The boost program will perform only by stepping on the clutch that properly avoids EPTT detrimental EPTTs when shifting. In contrast with the exact same market, 100mm length of change EPTTs and forty five% of shifting drive are respectively lowered.
[Solution Parameter]
Description | Unit | Parameter price | |
General duration | mm | 13930 | |
General width | mm | 2780 | |
All round Peak | mm | 3630 | |
Axle base | 1st ,2nd axle | mm | 1470 |
2nd ,3rd axle | 4300 | ||
third ,4th axle | 1350 | ||
Wheel Base | mm | 2304 2075 | |
Front overhang/rear overhang | mm | 2389/2064or 2376/2064 | |
Front extension/rear extension | mm | 2131/226 or 2144/226 | |
Complete vehicle mass in travel configuration | kg | 42200 | |
Axle load | Front axle | kg | 16200 |
Rear axle | 26000 | ||
Engine Design | WD615.338 | ||
Engine rated EPTT | kw/(r/min) | 276/2200 | |
Motor rated torque | N.m/(r/min) | 1500/1300-1600 | |
Max. vacation velocity | km/h | eighty five | |
Min. continual travel pace | km/h | 2~3 | |
Min. turning diameter | m | 24 | |
Min. ground clearance | mm | 327 | |
Max. grade capacity | % | 42 | |
Technique angle | deg | 19 | |
Departure angle | deg | 15 | |
Braking distance (at 30 km/h, total load ) | m | le10 | |
Oil consumption per 100km | L | forty | |
Exterior noise stage during acceleration touring | dB (A) | le88 | |
Sound level at seated place | dB (A) | le90 |
[Item Photograph]
[Organization Information]
[FAQ]
1: What kind terms of payment can be approved?
A: For phrases of payment, L/C, T/T, D/A, D/P, Western EPT (can be) could accepted.
two: What certificates are accessible in EPTTry?
A: For the certificate, we have CE, ISO, Gost, EPTA(United states)CCC.
three: What about the supply time?
A: 7-thirty daEPTTafter acquiring the deposit.
four: What about the warranty time?
A: 12 months soon after shipment or 2000 doing work several hours, whichever occuts first.
five. What about the Least OrEPTTEPTTtity?
A: The MOQ is 1 pcs.